Posted: 2025-10-26 08:01 AM
Hello all,
I’m trying to recreate an integral function block that exists on other platforms and cannot find a suitable one in RemoteConnect Control expert.
Would someone please help me figure out which function block/block combination in RemoteConnect would achieve the same function. Please see snippet for description.
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2025-10-29 10:05 AM
I don't see a direct equivalent in the RemoteConnect logic editor. You could build your own DFB to do this, I'm sure. But you might want to take a look at the TOTAL_xxxxx derived function blocks available in the SCADAPack x70 Extensions list. These were designed initially to totalize (integrate) flow values, but they could be used to integrate any analog values.
There are TOTAL_ blocks that integrate over hourly, daily, or monthly periods, or over specifically over 3 or 35 periods. Take a look at them and see if one might be helpful. Each has its own Help to explain how it works.
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2025-10-29 10:05 AM
I don't see a direct equivalent in the RemoteConnect logic editor. You could build your own DFB to do this, I'm sure. But you might want to take a look at the TOTAL_xxxxx derived function blocks available in the SCADAPack x70 Extensions list. These were designed initially to totalize (integrate) flow values, but they could be used to integrate any analog values.
There are TOTAL_ blocks that integrate over hourly, daily, or monthly periods, or over specifically over 3 or 35 periods. Take a look at them and see if one might be helpful. Each has its own Help to explain how it works.
Link copied. Please paste this link to share this article on your social media post.
 
					
				
				
			
		
 
					
				
				
			
		
You’ve reached the end of your document

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.