Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation
Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively. Register now to secure your spot!
Protection & Control
Schneider Electric support forum about Protection Relays, Substation Controllers & RTUs, Arc Flash Devices & Systems in Medium Voltage and Low Voltage. A place to get support on product selection, installation, commissioning and troubleshooting.
Link copied. Please paste this link to share this article on your social media post.
Hello everyone,
I am trying to test the residual overcurrent protection on a MiCOM P132 with FW 671 but it´s not working. It seems that something is blocking the start. The phase overcurrent was already checked and, it works fine. Perhaps there is something missing in the configuration (a screenshot of the configuration is attached).
Beforehand, thank you for your time.
Best regards,
Manuel Trebilcock
Link copied. Please paste this link to share this article on your social media post.
Hi,
Think you didn't enabled function on Parameters---Function Parameters--General functions--Main-- Syst. IN enabled USER.
THX,
Alin
Link copied. Please paste this link to share this article on your social media post.
Hi,
Think you didn't enabled function on Parameters---Function Parameters--General functions--Main-- Syst. IN enabled USER.
THX,
Alin
Link copied. Please paste this link to share this article on your social media post.
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.
With achievable small steps, users progress and continually feel satisfaction in task accomplishment.
Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.
of