Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation
Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively. Register now to secure your spot!
Protection & Control
Schneider Electric support forum about Protection Relays, Substation Controllers & RTUs, Arc Flash Devices & Systems in Medium Voltage and Low Voltage. A place to get support on product selection, installation, commissioning and troubleshooting.
Link copied. Please paste this link to share this article on your social media post.
Hi Team,
We have submitted a ticket to prepare the ETAP Library for the Power Logic P7 Relay.
The ETAP Technical team has raised some technical queries regarding this request, which are attached to this email.
Please provide your response as soon as possible.
Thanks,
Karthick C
Link copied. Please paste this link to share this article on your social media post.
Hi Karthick,
1. Regarding IDMT curves, considering Is the set threshold:
-The minimum trip level is 1.025 Is
- The level at which the tripping time becomes independent is 40 Is.
This is valid as long as measured currents are within the dynamic range of the CT inputs.
2. Regarding thermal overload and negative sequence overcurrent threshold, the Full load amps (FLA) parameter can be defined between 0.1 and 3.25 pu.
Link copied. Please paste this link to share this article on your social media post.
Hi Karthick,
1. Regarding IDMT curves, considering Is the set threshold:
-The minimum trip level is 1.025 Is
- The level at which the tripping time becomes independent is 40 Is.
This is valid as long as measured currents are within the dynamic range of the CT inputs.
2. Regarding thermal overload and negative sequence overcurrent threshold, the Full load amps (FLA) parameter can be defined between 0.1 and 3.25 pu.
Link copied. Please paste this link to share this article on your social media post.
Thanks Gregory.
I will share these answers with ETAP Technical team through Help Centre to prepare the Power Logic P7 Relay.
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.
With achievable small steps, users progress and continually feel satisfaction in task accomplishment.
Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.
of