Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Notifications
Login / Register
Community
Community
Notifications
close
  • Forums
  • Knowledge Center
  • Events & Webinars
  • Ideas
  • Blogs
Help
Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Login / Register
Sustainability
Sustainability

Join our "Ask Me About" community webinar on May 20th at 9 AM CET and 5 PM CET to explore cybersecurity and monitoring for Data Center and edge IT. Learn about market trends, cutting-edge technologies, and best practices from industry experts.
Register and secure your Critical IT infrastructure

Easergy T300: using VDS adapter

Protection & Control

Schneider Electric support forum about Protection Relays, Substation Controllers & RTUs, Arc Flash Devices & Systems in Medium Voltage and Low Voltage. A place to get support on product selection, installation, commissioning and troubleshooting.

cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Home
  • Schneider Electric Community
  • EcoStruxure Power & Grid
  • Protection & Control
  • Easergy T300: using VDS adapter
Options
  • Subscribe to RSS Feed
  • Mark Topic as New
  • Mark Topic as Read
  • Float this Topic for Current User
  • Bookmark
  • Subscribe
  • Mute
  • Printer Friendly Page
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
Top Experts
User Count
Araceli_Monje
Lt. Commander Araceli_Monje Lt. Commander
16
HenriGRASSET
Captain HenriGRASSET Captain
14
Rudolf_Simon
Commander Rudolf_Simon Commander
12
View All
Related Products
product field
Schneider Electric
PowerLogic T300

Invite a Colleague

Found this content useful? Share it with a Colleague!

Invite a Colleague Invite
Solved Go to Solution
Back to Protection & Control
Solved
Anonymous user
Not applicable

Posted: ‎2020-04-16 07:25 PM . Last Modified: ‎2023-05-30 10:18 PM

0 Likes
2
692
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2020-04-16 07:25 PM

Easergy T300: using VDS adapter

Hello,

 

How do we use the VDS adapter with the Maxeta VDS, please? I found some info in the SC150 installation manual but it is still not clear to us.

 

Kind regards,

MC

  • Thumbnail of PowerLogic T300
    Schneider Electric
    PowerLogic T300
View products (1)
Labels
  • Labels:
  • PowerLogic T300
Tags (4)
  • Tags:
  • Distribution Automation
  • easergy t300
  • secondary substation
  • t300
Reply
  • All forum topics
  • Previous Topic
  • Next Topic

Accepted Solutions
JYPOC
Lt. Commander JYPOC Lt. Commander
Lt. Commander

Posted: ‎2020-04-17 11:29 AM . Last Modified: ‎2020-04-23 12:45 AM

0 Likes
1
687
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2020-04-17 11:29 AM

Hello,

 

Easergy SC150-CAPA voltage input is compatible with VDS (voltage detection systems) of type LRP, LRM and LR following the IEC 61243-5 standard (maximum admissible voltage: 30 Vac LL).

 

From Maxeta website, it seems that their VDS falls in that category so it should work.

 

To connect the VDS to Easergy SC150 voltage input, process as follows:

  1. Wire the four VDS outputs (voltage phase 1, voltage phase 2, voltage phase 3 and neutral) to Easergy SC150-CAPA VDS adapter ref. EM59571 (offline)
  2. Connect a shielded RJ45 cable between the EM59571 and the SC150-CAPA input

 

When the MV voltage is powered, Easergy SC150-CAPA will calibrate using the output of the VDS.

 

If you have done all that and that you have an issue, please clarify what exactly.

Thank you

BR - Jean-Yves

See Answer In Context

  • Thumbnail of PowerLogic T300
    Schneider Electric
    PowerLogic T300
View products (1)
Tags (6)
  • Tags:
  • Distribution Automation
  • easergy t300
  • SC150
  • secondary substation
  • t300
  • VDS
Reply
Replies 2
JYPOC
Lt. Commander JYPOC Lt. Commander
Lt. Commander

Posted: ‎2020-04-17 11:29 AM . Last Modified: ‎2020-04-23 12:45 AM

0 Likes
1
688
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2020-04-17 11:29 AM

Hello,

 

Easergy SC150-CAPA voltage input is compatible with VDS (voltage detection systems) of type LRP, LRM and LR following the IEC 61243-5 standard (maximum admissible voltage: 30 Vac LL).

 

From Maxeta website, it seems that their VDS falls in that category so it should work.

 

To connect the VDS to Easergy SC150 voltage input, process as follows:

  1. Wire the four VDS outputs (voltage phase 1, voltage phase 2, voltage phase 3 and neutral) to Easergy SC150-CAPA VDS adapter ref. EM59571 (offline)
  2. Connect a shielded RJ45 cable between the EM59571 and the SC150-CAPA input

 

When the MV voltage is powered, Easergy SC150-CAPA will calibrate using the output of the VDS.

 

If you have done all that and that you have an issue, please clarify what exactly.

Thank you

BR - Jean-Yves
  • Thumbnail of PowerLogic T300
    Schneider Electric
    PowerLogic T300
View products (1)
Tags (6)
  • Tags:
  • Distribution Automation
  • easergy t300
  • SC150
  • secondary substation
  • t300
  • VDS
Reply
Anonymous user
Not applicable

Posted: ‎2020-04-24 03:48 AM

1 Like
0
674
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2020-04-24 03:48 AM

Thanks!

Reply
Preview Exit Preview

never-displayed

You must be signed in to add attachments

never-displayed

 
To The Top!

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practice
  • Experts Leaderboard
  • Contact Support
Brand-Logo
Subscribing is a smart move!
You can subscribe to this board after you log in or create your free account.
Forum-Icon

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account? Login

Terms & Conditions Privacy Notice Change your Cookie Settings © 2025 Schneider Electric

This is a heading

With achievable small steps, users progress and continually feel satisfaction in task accomplishment.

Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.

of