Power Distribution and Digital Support
Join experts & peers to learn, share and engage about the key trends of electrical distribution around safety, availability, efficiency and connectivity, as well as power standards & regulations. From design to implementation and operation, let’s discuss how digital and software are transforming your business and your day-to-day work.
Posted: 2021-02-25 08:40 AM . Last Modified: 2024-11-22 04:25 AM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-02-25 08:40 AM . Last Modified: 2024-11-22 04:25 AM
I want to open Ecodial files 4.8 into Ecodial 4.9.
Message :
File cannot be openend.
Unexpected file format.
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-03-14 11:33 PM
Here is an example;
We received a customer project (as shown here); with 10 feeders connected to the Main Low Voltage Switchboard - MLSB, Then, further loads are connected to the "sub distribution switchboards".
We have suggested in a following way;
Step 1: Suggested to create - 10 number small projects to realize the feeders.
Step 2: The main project is created - with 10 out goings.
Outcome :
End of the above two steps; the final project (which represent the main switchboard) is show as follows...
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-03-17 09:22 PM
Ecodial has considers the “kVAr needed for source + kVAr needed for the loads.”
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-02-25 08:52 AM
Hello,
Thanks for your query;
Can you please kindly enclose the project file (.each file) that you are trying to open at the latest INT version.
In general, the file created at the old INT version will be opened at latest INT version without any problem.
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-03-05 06:55 AM
We use now Ecodial 4.8 BE.
We have big problems with this version!
If the installation is large, the program will no longer work!
Is there a version Ecodial 4.9 BE?
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-03-07 09:11 PM
Hello
This behavior is based on the 'system memory and configuration.'
For the general system configuration; Ecodial application will be able to calculate and generate the report for the 'Electrical Network with 150 to 200 circuit components.
Ecodial BE :
The Ecodial Belgium application is not updated & not available for the latest 4.9 base line version.
Project file :
If you have an issue on a specific file; then kindly share with us.
Ecodial application development team, can help you in resolving the same.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-03-12 05:26 AM . Last Modified: 2021-03-12 05:28 AM
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-03-12 05:26 AM . Last Modified: 2021-03-12 05:28 AM
Thanks for your reply!
Is there a solution for electrical networks with more than 200 circuit components?
Many of our networks have more than 400 components!
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-03-14 11:33 PM
Here is an example;
We received a customer project (as shown here); with 10 feeders connected to the Main Low Voltage Switchboard - MLSB, Then, further loads are connected to the "sub distribution switchboards".
We have suggested in a following way;
Step 1: Suggested to create - 10 number small projects to realize the feeders.
Step 2: The main project is created - with 10 out goings.
Outcome :
End of the above two steps; the final project (which represent the main switchboard) is show as follows...
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-03-17 09:22 PM
Ecodial has considers the “kVAr needed for source + kVAr needed for the loads.”
Link copied. Please paste this link to share this article on your social media post.
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.