Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2023-01-3103:33 AM
EPD302 pressure transducer installation instruction on curved duct
Hello
Mounting instruction of EPD302 predicts mounting on straight air duct. How it works with curved ducts? How long after bending I can mount EPD302? Directly after bending or 5 duct diameters after bending?
Link copied. Please paste this link to share this article on your social media post.
Posted: 2023-01-3108:33 AM
@PiotrJakubczyk I do not see this information in our documentation. I did find some some information that may provide a good guide on the Veris website for the SE AA18, AA19, AA20 Provide smooth, straight duct sections a minimum of 8-1/2 diameters in length upstream and 1-1/2 diameters downstream from the pitot tube.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2023-01-3108:33 AM
@PiotrJakubczyk I do not see this information in our documentation. I did find some some information that may provide a good guide on the Veris website for the SE AA18, AA19, AA20 Provide smooth, straight duct sections a minimum of 8-1/2 diameters in length upstream and 1-1/2 diameters downstream from the pitot tube.