We Value Your Feedback!
Could you please spare a few minutes to share your thoughts on Cloud Connected vs On-Premise Services. Your feedback can help us shape the future of services.
Learn more about the survey or Click here to Launch the survey
Schneider Electric Services Innovation Team!
Industry Automation and Control Forum
This forum is addressing industrial automation design & engineering, operations, asset performance, cyber security and digital transformation for Plants & Machines.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2024-10-31 02:03 PM
Good afternoon, I have an Altivar 320 currently set up so that when Digital Input 1 (DI1) is activated, it starts the motor and allows control via the potentiometer with LSP = 6 Hz and MSP = 60 Hz. Now, I’ve been asked to add a function where, when Digital Input 2 (DI2) is activated, the MSP value changes to 45 Hz, allowing it to be adjustable with the potentiometer across the full range, from 6 Hz to 45 Hz. The same would apply to DI3. Any ideas? Thanks in advance.
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2024-11-04 10:25 PM
Hi check these parameters. SH2/SH4 HSP2..4
Sorry for the german text in screenshot. But with the parameter name you will find the meaning of the parameters in the manual.
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2024-11-18 12:41 PM
Good afternoon, Bastian. Thank you for your support. I made the change, and when I activate DI2, the VFD runs at 45 Hz, but it is not adjustable from the potentiometer. Thank you.
Link copied. Please paste this link to share this article on your social media post.
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.
With achievable small steps, users progress and continually feel satisfaction in task accomplishment.
Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.
of