Schneider Electric support forum about installation and configuration for DCIM including EcoStruxure IT Expert, IT Advisor, Data Center Expert, and NetBotz
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2023-12-2109:01 AM. Last Modified: 2023-12-2109:15 AM
how to set up dates for Work orders in dd-mm-yy
i need help to change dates format in our IT Advisor, because the actual format for "required to" is mm-dd-yy, but in our institution we manage format dd-mm-yy instead as in the rest of the system. Please indicate the step by step to set up this format based in our need.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2023-12-2706:04 AM
Hello, if I may ask, are you running the ITA desktop client in english language? The date format seen in work-orders does change depending on the language used in the desktop client. For example if I switch my desktop client to use spanish instead of english, the date format in my work-orders changes to DD/MM/YY from MM/DD/YY.
If you are interested to test this change, check this community page for instructions.