EcoStruxure IT forum
Schneider Electric support forum about installation and configuration for DCIM including EcoStruxure IT Expert, IT Advisor, Data Center Expert, and NetBotz
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-07-03 03:29 AM . Last Modified: 2024-04-08 11:57 PM
It there a plan to implement the drag and drop method of input for equipment and patch panel editing with in the network fields. the select, edit input, item edit and enter is very time consuming when you have mass input.
(CID:106206380)
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-07-03 03:30 AM . Last Modified: 2024-04-08 11:57 PM
Hi Brian,
I was wondering if using the "Connection tool" could be something you are looking for. That is an additional feature offered in the rack view - a visual representation of network connections/configurations, more info available here:Configuring Network Connections In Rack View
Hope this helps,
Kind regards
(CID:106206412)
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-07-03 03:30 AM . Last Modified: 2023-10-31 10:55 PM
This question is closed for comments. You're welcome to start a new topic if you have further comments on this issue.
Link copied. Please paste this link to share this article on your social media post.
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.