Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Notifications
Login / Register
Community
Community
Notifications
close
  • Forums
  • Knowledge Center
  • Events & Webinars
  • Ideas
  • Blogs
Help
Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Login / Register
Sustainability
Sustainability

Join our "Ask Me About" community webinar on May 20th at 9 AM CET and 5 PM CET to explore cybersecurity and monitoring for Data Center and edge IT. Learn about market trends, cutting-edge technologies, and best practices from industry experts.
Register and secure your Critical IT infrastructure

Two pump templates with different sets of tags or one pump template and a way to hide tags not used?

EcoStruxure Geo SCADA Expert Forum

Schneider Electric support forum about installation, configuration, integration and troubleshooting of EcoStruxure Geo SCADA Expert (ClearSCADA, ViewX, WebX).

cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Home
  • Schneider Electric Community
  • Remote Operations
  • EcoStruxure Geo SCADA Expert Forum
  • Two pump templates with different sets of tags or one pump template and a way to hide tags not used?
Options
  • Subscribe to RSS Feed
  • Mark Topic as New
  • Mark Topic as Read
  • Float this Topic for Current User
  • Bookmark
  • Subscribe
  • Mute
  • Printer Friendly Page
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
Top Experts
User Count
sbeadle
Kirk sbeadle Kirk
307
AndrewScott
Admiral AndrewScott
95
BevanWeiss
Spock BevanWeiss
90
AdamWoodlandToo
Lt. Commander AdamWoodlandToo
36
View All
Related Products
product field
Schneider Electric
EcoStruxure™ Geo SCADA Expert

Invite a Colleague

Found this content useful? Share it with a Colleague!

Invite a Colleague Invite
Back to EcoStruxure Geo SCADA Expert Forum
Tanquen
Lt. Commander Tanquen
Lt. Commander

Posted: ‎2020-10-26 03:03 PM . Last Modified: ‎2023-05-03 12:08 AM

0 Likes
5
2539
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2020-10-26 03:03 PM . Last Modified: ‎2023-05-03 12:08 AM

Two pump templates with different sets of tags or one pump template and a way to hide tags not used?

Just wondering the best way to work with almost identical templates for devices but some have a subset of tags. So maybe half of your hundred pumps have a leak alarm and the other half doesn't. Do you make two pump templates so that you're not creating extra database points against your license for that leak tag that you don't need or is there a way to make one pump template and disable or hide that tag?

Labels
  • Labels:
  • Logic
  • ViewX
  • Tags:
  • english
  • scada
  • SCADA app
  • SCADA software
  • SCADA tutorial
  • Telemetry and SCADA
Reply

Link copied. Please paste this link to share this article on your social media post.

  • All forum topics
  • Previous Topic
  • Next Topic
Replies 5
AdamWoodland
AdamWoodland Schneider Alumni (Retired)
Schneider Alumni (Retired)

Posted: ‎2020-10-26 04:42 PM

0 Likes
1
2531
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2020-10-26 04:42 PM

This comes down to how you structure your templates. The simple way is a flat structure and so in your case it might be best to create a second template. You can look into using abstract points in your template and converting in the instance, but this might be time consuming with too many points and too many instances.

 

The better way might be to have a more structured template, i.e. define templates for your blobs and create instances of those within a template. You'll still need multiple templates but by bringing in a common template for say RTUs and mimics, and then also for Pump type 1, type 2, etc it provides a very modular setup. The first time you see it it looks confusing, but as you have a common template across multiple "parent templates" maintenance becomes much easier.

 

For example, create templates for:

 

* RTU

* Displays

* Site Reports

* Pump Type A

* Pump Type B

* Pump Type C

* Valve Type A

* Valve Type B

* Valve Type C

 

Then create a parent template which is just a grouping of instances, and would consist of the first three always, then pick and choose from the others as necessary to build that example site. Then create a second parent template and again pick the first three, and another mix.

 

If you have no consistency across anything this is probably really inefficient, but if you have standards on site construction it can be really powerful especially when you're dealing with many hundreds of sites.

  • Tags:
  • english
  • scada
  • SCADA app
  • SCADA software
  • SCADA tutorial
  • Telemetry and SCADA
Reply

Link copied. Please paste this link to share this article on your social media post.

BevanWeiss
Spock BevanWeiss
Spock

Posted: ‎2020-10-26 10:09 PM

In response to AdamWoodland
0 Likes
0
2526
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2020-10-26 10:09 PM

Normally we'd have a set of templates for each device type.

So you might end up with:

- Basic Pump

- Remote Control Pump

- VSD Pump

- Remote Control VSD Pump

 

- Wet Well - Low + High Floats

- Wet Well - Low + High Floats + Level Transmitter

- Wet Well - Level Transmitter

 

- RTU

 

Then you'd have a site (2 pump SPS) that would have two pumps a wet well and an RTU.

When you instantiate that site, you can swap the template instances between different types... so you could swap the default Basic Pump template instance out for a VSD Pump, or a Remote Control VSD Pump.

Maybe this site has a level transmitter, so you swap out the Wet Well - Low + High Floats with a Wet Well - Low + High Floats + Level Transmitter.

 

If you have 100 different kinds of pump versions in your field code / wiring... well that's a lower level standardisation problem, and Geo SCADA Expert isn't a magician... it won't solve all your problems, you need to solve some yourself.

For minor variations, then having an Abstract Point is the cleanest approach.  But it does add a point licence, even when not used (which I personally hate... but I don't see that licence aspect changing).

If licencing is a problem, and the abstract points would break the camel's back, then you can dummy in the animations, and use an IIF(EXISTS(..), ..., ...) kind of thing in every animation expression.  But it's a bit horrible.

 

You do have to be a little mindful of the nesting depth with templates however.  Each level of template nesting does cost a bit in regards to template propagation lock times... So try not to go too deep with template nesting (this is something I struggle with).


Lead Control Systems Engineer for Alliance Automation (VIC).
All opinions are my own and do not represent the opinions or policies of my employer, or of my cat..
  • Tags:
  • english
  • scada
  • SCADA app
  • SCADA software
  • SCADA tutorial
  • Telemetry and SCADA
Reply

Link copied. Please paste this link to share this article on your social media post.

MarkPitout
Lieutenant JG MarkPitout Lieutenant JG
Lieutenant JG

Posted: ‎2020-10-29 01:09 AM

0 Likes
2
2510
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2020-10-29 01:09 AM

Sounds like a feature request for future Geo SCADA releases: Templates with optional components that can be enabled/disabled per instance. And preferably, points in disabled portions of an instance, should not be counted in the point count for the license.

 

In Ecostruxure Process Expert (formerly Hybrid DCS), the templates are constructed this way - you have one template with potentially all the features you may need, but the features can be enabled/disabled on instances as required. Features that are disabled, simply don't get generated in the final PLC and SCADA code and tags. So for example, the "Motor" template caters for several types of motor starters - simple DOL, 2-speed, forward/reverse, with or without field start/stop stations. etc. etc. It would have been a nightmare to have distinct templates for each kind of motor starter.   

 

Coming back to Geo SCADA - I don't have anything to add to what Adam and Bevan advised. In the end it becomes a balancing act of managing the complexity of the templates, vs reducing the number of different templates you have.

  • Tags:
  • english
  • scada
  • SCADA app
  • SCADA software
  • SCADA tutorial
  • Telemetry and SCADA
Reply

Link copied. Please paste this link to share this article on your social media post.

BevanWeiss
Spock BevanWeiss
Spock

Posted: ‎2020-10-29 03:57 PM

In response to MarkPitout
0 Likes
1
2490
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2020-10-29 03:57 PM

I'm not sure the concept of 'disabling' points in a template instance makes much sense for Geo SCADA Expert.

 

For example, if I have an animation that is:

("Point 1" + "Point 2" + "Point 2") / ("Point 1" + "Point 2")

And I disabled "Point 2", what does this animation mean?  does it become entirely invalid, does "Point 2" get replaced with 0?

 

How does this kind of situation work in Ecostruxure Process Expert?

 

 

The one thing I would like to see in Geo SCADA is the ability to 'extend' templates.

So Template 1 has:

* Point 1

* Point 2

 

Then I could have Template 2 which 'extends' Template 1, and adds a Point 3.  This means Template 2 has

* Point 1

* Point 2

* Point 3

 

Animations etc already in Template 1 would still apply to Template 2 (unless Property Overridden and changed)


Lead Control Systems Engineer for Alliance Automation (VIC).
All opinions are my own and do not represent the opinions or policies of my employer, or of my cat..
  • Tags:
  • english
  • scada
  • SCADA app
  • SCADA software
  • SCADA tutorial
  • Telemetry and SCADA
Reply

Link copied. Please paste this link to share this article on your social media post.

MarkPitout
Lieutenant JG MarkPitout Lieutenant JG
Lieutenant JG

Posted: ‎2020-11-10 01:36 AM

In response to BevanWeiss
0 Likes
0
2437
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2020-11-10 01:36 AM

You make a good point. 

 

In Process Expert, it is very possible to create a template where, if a specific tag is not generated, then the resulting graphics animations would produce an error. Template design and testing can be a very complex affair in Process Expert. Sometimes script in the background is required, to first determine the existence of a tag, before considering it in the calculation of animations (similar to IIF(EXIST,...). Added to that the developers of Process Expert have a very tough task producing template libraries that are suitable for all scenarios and for all customers. (one of the reasons why there are specialized libraries for Mining, Water, Food and Bev. etc.)

 

Something that Geo SCADA has got going for it, is the simplicity of making templates. For Process Expert there exists a full three day course just focused on creating and modifying templates, because it is not a straight forward process.

 

I think your suggestion of extending templates is perhaps a better route, as it would give some more flexibility, without making the process of creating and modifying templates overly complex. I wonder if the concept of template extension is achievable, without creating the same performance implications that come with deeply nested templates.  eg. Template10 extends Template9, which extends Template8, which extends... etc. etc.

  • Tags:
  • english
  • scada
  • SCADA app
  • SCADA software
  • SCADA tutorial
  • Telemetry and SCADA
Reply

Link copied. Please paste this link to share this article on your social media post.

Preview Exit Preview

never-displayed

You must be signed in to add attachments

never-displayed

 
To The Top!

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practice
  • Experts Leaderboard
  • Contact Support
Brand-Logo
Subscribing is a smart move!
You can subscribe to this board after you log in or create your free account.
Forum-Icon

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account? Login

Terms & Conditions Privacy Notice Change your Cookie Settings © 2025 Schneider Electric

This is a heading

With achievable small steps, users progress and continually feel satisfaction in task accomplishment.

Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.

of