Ask our Experts
Didn't find what you are looking for? Ask our experts!
Ask Me About Webinar: Data Center Assets - Modeling, Cooling, and CFD Simulation
Join our 30-minute expert session on July 10, 2025 (9:00 AM & 5:00 PM CET), to explore Digital Twins, cooling simulations, and IT infrastructure modeling. Learn how to boost resiliency and plan power capacity effectively. Register now to secure your spot!
Schneider Electric support forum about installation, configuration, integration and troubleshooting of EcoStruxure Geo SCADA Expert (ClearSCADA, ViewX, WebX).
Search in
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-10-29 08:54 AM . Last Modified: 2023-05-03 12:08 AM
Can some one help me with the architecture or a write up ( clearly showing components ) for connecting primary equipment in a 66 KV switchyard through smart terminal blocks placed in the switchyard ( obviously inside a IP55 or IP 65 enclosure ) to a BCU inside a control room located at 100 or 200 meters over a OFC network ensuring redundancy ?
Also if analog signals like transformer's OTI and WTI are to be taken to the control room , how to do it using smart terminal blocks
Link copied. Please paste this link to share this article on your social media post.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2020-10-29 03:51 PM
Your question doesn't sound related to Geo SCADA Expert.
The architecture itself is likely to depend on what devices you have and the device vendors preferred architectures.
However, I believe that this question is more suitable for a different forum than this one, which is specific to Geo SCADA Expert (aka ClearSCADA)
Link copied. Please paste this link to share this article on your social media post.
You’ve reached the end of your document
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.