Issue
Is it possible to command the outputs on an MP-C controller before it has been commissioned in EBO?
Product Line
EcoStruxure Building Operation
Environment
Building Operation Multi-purpose Controller
Cause
It is necessary to verify the field device wiring and control prior to the MP-C controller being brought online.
Resolution
The following video demonstrates how temporary outputs can be created and controlled in an MP-C controller without the use of a front end system.