Warning
Hazard of Electric Shock: Remove all power from all devices before removing any covers or doors of the system. Disconnect power at the device and at the power source.
Issue
Need for a dual redundancy power supply for the Automation Server.
Product Line
EBO EcoStruxure Building Operation.
Environment
Building Operation Automation Server.
Cause
Understanding how to create a fail-safe power supply for an Automation Server.
Resolution
To provide dual power redundancy to an Automation Server, a possible solution can be to use a Phaseo ABL4_ABL8RED24400.
This will allow the connection of two 24V PSU's to be connected to the inputs.
Then connect the output of the Phaseo ABL4_ABL8RED24400 to the AS's PS-24V
See the attached document and diagram for more information.