Issue
Can I use a Master-Slave time schedule in an access control system?
Environment
I/NET Site
Cause
Can I use a Master-Slave time schedule in an access control system?
Resolution
The access control system does not support a Master-Slave scheduling relationship between points, as does the standard I/NET time scheduling editor.