Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2023-11-1403:38 AM
Panel board metering
Hello,
we are installing a new panel board for an office block. The DNO has brought in a new supply into the service head with combined CT chamber and metering. From there we are taking the supply into a Glasgow switch/isolator and into the incoming side of the main panel.
does the main panel require its on meter on the incoming side or is it fine to take the reading from the meter on the service head?
for context, each outgoing supply from the panel board will have its own meter.