Support forum to share knowledge about installation and configuration of APC offers including Home Office UPS, Surge Protectors, UTS, software and services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2021-06-2910:52 PM. Last Modified: 2024-03-2012:59 AM
UTS6H "Circuit Load Type": Significance?
Has anybody figured out how the selection of different "Load Types" (e.g. Lights, Garage Door Opener, Furnace (Hot Air), Furnace (Hot Water), Freeezer, Refrigerator... and so-forth) affects the UTS6H's operation?
I'm guessing they affect default values for things like Backup Source Type, Surge Overload Time, and so-forth.... but that's only a guess.
And the distinctions between "Freezer" and "Refrigerator" and Hot Air vs Hot Water furnace have me wondering.
My agenda is getting some control over which circuits get shed first.