Welcome to the new Schneider Electric Community

It's your place to connect with experts and peers, get continuous support, and share knowledge.

Close
Important Announcement: WELCOME to the new Schneider Electric Community! Community is now no longer part of Exchange, and is now rebranded under se.com. If you have any bookmarks and links saved, we request you to update them to ensure that you continue accessing our community from this new location. For any issues that you might encounter as part of this change, please reach out to SchneiderCommunity.Support@se.com, and the team will help to get your issues resolved.
Invite a Co-worker
Send a co-worker an invite to the Exchange portal.Just enter their email address and we’ll connect them to register. After joining, they will belong to the same company.
Send Invite Cancel
82506members
350104posts

Question on APC BR1000G

APC UPS for Home and Office Forum

Schneider Electric support forum for our APC offers including Home Office UPS, Surge Protectors, UTS, software and services and associated products designed to share knowledge, installation, and configuration.

Solved
gilloz_apc
Crewman
Crewman
0 Likes
2
125

Question on APC BR1000G

This was originally posted on APC forums on 10/25/2011


When I first switch ON my Back-UPS BR1000G, I wait until it completes it's Battery Load test before switching ON my computer. My Monitor comes ON right after the Battery Load test, but only remains ON for several seconds before it goes OFF again. I have to assume that if I do not switch ON my computer before then, this would be a normal occurance. Is that correct? I have my Back UPS set up in that the computer controls the other Battery only receptecles when powered ON or OFF.


Accepted Solutions
BillP
Administrator Administrator
Administrator
0 Likes
0
125

Re: Question on APC BR1000G

This reply was originally posted by Jonathan on APC forums on 10/25/2011


Hello Gilloz,

Good day. If the UPS master enable functionality is turned on, that is how it should work. The load on the controlled by master would only turn on once it has detected that the load on the master is drawing power.

See Answer In Context

2 Replies 2
gilloz_apc
Crewman
Crewman
0 Likes
0
125

Re: Question on APC BR1000G

This was originally posted on APC forums on 10/26/2011


Thanks JonPro for your response. I pretty much thought that that is what was happening. Is there any way I can manually adjust the time differential between the end of the Battery Load Test and the time it sequences out before switching ON the computer?

BillP
Administrator Administrator
Administrator
0 Likes
0
126

Re: Question on APC BR1000G

This reply was originally posted by Jonathan on APC forums on 10/25/2011


Hello Gilloz,

Good day. If the UPS master enable functionality is turned on, that is how it should work. The load on the controlled by master would only turn on once it has detected that the load on the master is drawing power.