Sustainability
Sustainability

Join our "Ask Me About" community webinar on May 20th at 9 AM CET and 5 PM CET to explore cybersecurity and monitoring for Data Center and edge IT. Learn about market trends, cutting-edge technologies, and best practices from industry experts.
Register and secure your Critical IT infrastructure

Searching a best practice for a Shutdown Scenario

APC UPS Data Center & Enterprise Solutions Forum

Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.

cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Home
  • Schneider Electric Community
  • APC UPS, Critical Power, Cooling and Racks
  • APC UPS Data Center & Enterprise Solutions Forum
  • Searching a best practice for a Shutdown Scenario
Options
  • Subscribe to RSS Feed
  • Mark Topic as New
  • Mark Topic as Read
  • Float this Topic for Current User
  • Bookmark
  • Subscribe
  • Mute
  • Printer Friendly Page
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
Top Experts
User Count
BillP
Administrator BillP Administrator
5060
voidstar_apc
Janeway voidstar_apc
196
Erasmus_apc
Sisko Erasmus_apc
112
Teken
Spock Teken
109
View All

Invite a Colleague

Found this content useful? Share it with a Colleague!

Invite a Colleague Invite
Solved Go to Solution
Back to APC UPS Data Center & Enterprise Solutions Forum
Solved
Anonymous user
Not applicable

Posted: ‎2021-06-26 12:44 AM . Last Modified: ‎2024-03-19 02:49 AM

0 Likes
1
589
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2021-06-26 12:44 AM . Last Modified: ‎2024-03-19 02:49 AM

Searching a best practice for a Shutdown Scenario

Hello Guys

We have a vSphere6 test environment with an ESX host running 4 VMs:
two Windows 2008 servers, a virtual appliance with vCenter 6, and a
PCNS 4.2 appliance. The UPS is a Smart-UPS 3000 with MGMT card 2, AP9630

We are currently looking for a best practice for a Shutdown Scenario
in order to implement this with customers.

During the shutdown configuration, the MGMT card has a low battery duration of 8 minutes
and a Shutdown Delay of 180 seconds, the total remaining time is about 15 min.

In the PCNS appliance, "Runtime Exceeded" and "Runtime below Threshold" were set up as shutdown events.

I have found that after a shutdown, when the power is back again, a shutdown is triggered.
The battery is not recharged enough at this time, i.e. the remaining runtime is less than set,
and the Shutdown Event is triggered again.

I would like to know how I tackle this problem with the Shutdown Events "Runtime Exceeded" and "
"Runtime below Threshold".

Can someone give me experience values ​​how the problem was solved?

Do you work with the events "Runtime Exceeded" and "Runtime below Threshold" or with the event
"UPS on Battery", which does not have the problem of shutdown after restarting.

If there is a delay in the UPS on Battery Shutdown event, a power failure of a few seconds or minutes
does not immediately trigger the shutdown.

Thank you for any suggestions

kind regards

Andreas Knopp

Labels
  • Labels:
  • General Questions & Suggestions
Reply

Link copied. Please paste this link to share this article on your social media post.

  • All forum topics
  • Previous Topic
  • Next Topic

Accepted Solutions
BillP
Administrator BillP Administrator
Administrator

Posted: ‎2021-06-26 12:44 AM . Last Modified: ‎2024-03-19 02:49 AM

0 Likes
0
589
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2021-06-26 12:44 AM . Last Modified: ‎2024-03-19 02:49 AM

Hi,

You should review both Runtime Exceeded and Runtime Below Threshold by clicking on the help files or in the PCNS VMware User's Guide. Available runtime has been exceeded is explained on page 101 and Runtime Below Threshold is explained on page 104 of the User's Guide. 

Basically Runtime Exceeded is triggered when the available runtime of the UPS is not sufficient to allow the configured system/s to power up and power down safely. As an example the low battery threshold you sent is 8 minutes. PCNS will trigger a shutdown if configured to do so if the available runtime of the UPS is lower that 8 minutes or if the system and VMs require more than 8 minutes to power up and down. If you have configure a power down delay for the VMs of 2 minutes, power down of vCenter server of 4 minutes and the OS needs 2 minutes, and a power up time of 2 minutes for the VMs available runtime will be exceeded because the program requires there be a minimum of 10 minutes and the low battery threshold is set for 8. I recommend in the above scenario to set low battery to 12 minutes at a minimum. The 10 minutes needed plus 2. See page 87 of the User's Guide for a graph.  

Runtime below threshold will trigger a shutdown when the available runtime of the UPS falls below the set threshold. As an example if configured to do so PCNS will start the shutdown process when it see that the UPS has less then 10 minutes of runtime. 

On 10/20/2017 7:49 AM, Andreas said:

If there is a delay in the UPS on Battery Shutdown event, a power failure of a few seconds or minutes
does not immediately trigger the shutdown.

You can configure a power up delay in the NMC. Depending on the Smart-UPS 3000 you have the setting is either under the shutdown settings or outlet group settings. The delay will allow the batteries to charge so that when the system is started the available runtime and runtime below threshold will not be met.  

See Answer In Context

Reply

Link copied. Please paste this link to share this article on your social media post.

Reply 1
BillP
Administrator BillP Administrator
Administrator

Posted: ‎2021-06-26 12:44 AM . Last Modified: ‎2024-03-19 02:49 AM

0 Likes
0
590
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Subscribe to RSS Feed
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

Posted: ‎2021-06-26 12:44 AM . Last Modified: ‎2024-03-19 02:49 AM

Hi,

You should review both Runtime Exceeded and Runtime Below Threshold by clicking on the help files or in the PCNS VMware User's Guide. Available runtime has been exceeded is explained on page 101 and Runtime Below Threshold is explained on page 104 of the User's Guide. 

Basically Runtime Exceeded is triggered when the available runtime of the UPS is not sufficient to allow the configured system/s to power up and power down safely. As an example the low battery threshold you sent is 8 minutes. PCNS will trigger a shutdown if configured to do so if the available runtime of the UPS is lower that 8 minutes or if the system and VMs require more than 8 minutes to power up and down. If you have configure a power down delay for the VMs of 2 minutes, power down of vCenter server of 4 minutes and the OS needs 2 minutes, and a power up time of 2 minutes for the VMs available runtime will be exceeded because the program requires there be a minimum of 10 minutes and the low battery threshold is set for 8. I recommend in the above scenario to set low battery to 12 minutes at a minimum. The 10 minutes needed plus 2. See page 87 of the User's Guide for a graph.  

Runtime below threshold will trigger a shutdown when the available runtime of the UPS falls below the set threshold. As an example if configured to do so PCNS will start the shutdown process when it see that the UPS has less then 10 minutes of runtime. 

On 10/20/2017 7:49 AM, Andreas said:

If there is a delay in the UPS on Battery Shutdown event, a power failure of a few seconds or minutes
does not immediately trigger the shutdown.

You can configure a power up delay in the NMC. Depending on the Smart-UPS 3000 you have the setting is either under the shutdown settings or outlet group settings. The delay will allow the batteries to charge so that when the system is started the available runtime and runtime below threshold will not be met.  

Reply

Link copied. Please paste this link to share this article on your social media post.

Preview Exit Preview

never-displayed

You must be signed in to add attachments

never-displayed

 
To The Top!

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practice
  • Experts Leaderboard
  • Contact Support
Brand-Logo
Subscribing is a smart move!
You can subscribe to this board after you log in or create your free account.
Forum-Icon

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account? Login

Terms & Conditions Privacy Notice Change your Cookie Settings © 2025 Schneider Electric

This is a heading

With achievable small steps, users progress and continually feel satisfaction in task accomplishment.

Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.

of