SmartConnector Forum
Schneider Electric support forum about SmartConnector applications for integration of other building management systems (BMS) into EcoStruxure Building Operation.
Link copied. Please paste this link to share this article on your social media post.
Summary of the Integration Goals:
IBM Maximo software is used for work order process. Work orders shall be created on Maximo also can be seen at EcoStruxure. Maximo work orders can be closed form EcoStruxure Building Operation,
IBM Tivoli software is used for event management. Data connected to EcoStruxure Building Operation and i.e. connection loss, temperature alarms and abnormalities can be monitored from Tivoli software.
The integration shall allow physical assets from BMS (or ISP) database to be connected to IBM pool; the asset list can be uploaded or scanned periodically by IBM.
Link copied. Please paste this link to share this article on your social media post.
Hello,
The U.S. Solutions Engineering Team has recently developed an EBO 2.0 Smart Connector Extension designed to map EBO Alarms to Maximo Assets for Work Order creation and updates. Alarm categories are used to configure which alarms are delivered to Maximo. Configuration spreadsheets are used to map each alarm to a Maximo Site, Owner and Asset ID. Multiple points can be mapped to the same Asset ID. ALM’s & RTN’s create (or update) Maximo Work Orders by storing the TimeStamp, ALM/RTN Message, Point Value and Point Path in the Work Order's long description. All Work Order processing and management is performed through Maximo. For more information, email COE@Schneider-Electric.com
Ellis
Link copied. Please paste this link to share this article on your social media post.
Hello,
The U.S. Solutions Engineering Team has recently developed an EBO 2.0 Smart Connector Extension designed to map EBO Alarms to Maximo Assets for Work Order creation and updates. Alarm categories are used to configure which alarms are delivered to Maximo. Configuration spreadsheets are used to map each alarm to a Maximo Site, Owner and Asset ID. Multiple points can be mapped to the same Asset ID. ALM’s & RTN’s create (or update) Maximo Work Orders by storing the TimeStamp, ALM/RTN Message, Point Value and Point Path in the Work Order's long description. All Work Order processing and management is performed through Maximo. For more information, email COE@Schneider-Electric.com
Ellis
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.