Join experts & peers to learn, share and engage about the key trends of electrical distribution around safety, availability, efficiency and connectivity, as well as power standards & regulations. From design to implementation and operation, let’s discuss how digital and software are transforming your business and your day-to-day work.
Search in
Link copied. Please paste this link to share this article on your social media post.
Posted: 2025-09-04 07:20 AM
Digital power meters play a critical role in monitoring energy consumption, improving efficiency, and supporting electrical safety.
Whether you're installing a PowerLogic, iEM, or equivalent device, following a structured setup process ensures accurate readings and reliable performance.
Here is a simplified overview of the key steps from unboxing to commissioning:
1. Preparation + Inspection
Before installation, verify the meter model, accessories, and documentation. Inspect the device for any physical damage and confirm compatibility with the electrical system.
2. Mounting + Wiring
Install the meter according to the manufacturer’s guidelines, typically on DIN rail or panel cut-out. Ensure correct wiring of voltage inputs, current transformers (CTs), and communication ports. In addition, pay close attention to CT polarity and phase alignment.
3. Configuration
Power up the device and configure basic parameters such as system type (single-phase or three-phase), CT ratios, voltage range, and communication settings (Modbus, Ethernet, etc.).
4. Verification
Use commissioning tools or software to verify data accuracy. Check real-time values, perform a load test, and confirm communication with the monitoring system.
5. Documentation
Record configuration settings, wiring diagrams, and test results. Ensure the installation is labeled and documented for future maintenance.
Proper commissioning of a digital power meter is essential for reliable energy monitoring and system diagnostics. It is recommended to follow manufacturer-specific guidelines and perform a full functional test before integrating the meter into a broader energy management system.
Link copied. Please paste this link to share this article on your social media post.
You’ve reached the end of your document
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.