We Value Your Feedback! Could you please spare a few minutes to share your thoughts on Cloud Connected vs On-Premise Services. Your feedback can help us shape the future of services. Learn more about the survey or Click here to Launch the survey Schneider Electric Services Innovation Team!
About PUE and DCIE
ITA Energy Efficiency
Learn to use the EcoStruxure IT Advisor: Energy Efficiency module (on-premises deployments only) to view the IT load, PUE/DCiE, costs, and CO2 emissions.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Power Usage Effectiveness (PUE) and Data Center Infrastructure Efficiency (DCiE) are commonly used metrics for determining if energy efficiency improvements should be made.
PUE
PUE = Total Facility Power / IT Equipment Power
The range is from 1 to infinity (5 in ITA Energy Efficiency). The lower the value is, the better the efficiency is. 1 being 100% efficiency (all power used by IT equipment only).
DCiE
DCiE = IT Equipment Power / Total Facility Power x 100%
The range is a percentage. The higher the value is, the better the efficiency is. 100% being 100% efficiency (all power used by IT equipment only).
*Total Facility Power is the total power entering the data center. The measurement point is at or near the facility's utility meter.
*IT Equipment Power is the power delivered to the servers (after power conversion, switching, etc.).