Gateways and Energy Servers
Schneider Electric support forum to share knowledge about product selection, installation and troubleshooting for EcoStruxure Panel Server, PowerTag, Com'X, Link150…
User | Count |
---|---|
90 | |
46 | |
38 | |
29 |
Link copied. Please paste this link to share this article on your social media post.
How much maximum distance can be maintained for better connectivity between PAS600 and TH110 & CL110 sensors in MV switchgear panel..? Is there any supporting document available to get convince customers.
As in MV panels 3 to 4 metallic barrier between PAS600 & TH110, So what is the better operating range between them..
Link copied. Please paste this link to share this article on your social media post.
Hi @sesa197068
Please have a look at the attached document. Also in the forum as well https://community.se.com/t5/Gateways-and-Energy-Servers/Wireless-Communication-Architectures-With-Ec...
Hope it helps!
Link copied. Please paste this link to share this article on your social media post.
Hi @sesa197068
Please have a look at the attached document. Also in the forum as well https://community.se.com/t5/Gateways-and-Energy-Servers/Wireless-Communication-Architectures-With-Ec...
Hope it helps!
Link copied. Please paste this link to share this article on your social media post.
Is there a document where it has listed examples on installation of these sensors and overall recommendation based on number of cubicles, material types and thickness ?
Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.
With achievable small steps, users progress and continually feel satisfaction in task accomplishment.
Usetiful Onboarding Checklist remembers the progress of every user, allowing them to take bite-sized journeys and continue where they left.
of