Dear team,
We are able to get the output values from the updated OID’s attached .
PDU Parameters |
New Updated OIDs for the parameters |
PDU Voltage |
1.3.6.1.4.1.318.1.1.26.6.3.1.6.1 |
PDU Current |
1.3.6.1.4.1.318.1.1.26.6.3.1.5.1 |
PDU active power |
1.3.6.1.4.1.318.1.1.12.1.16.0 |
PDU reactive power |
- |
PDU Apparent power |
1.3.6.1.4.1.318.1.1.12.1.18.0 |
PDU power factor |
1.3.6.1.4.1.318.1.1.12.1.17.0 |
PDU Energy KWAH |
Not Found (Required) |
PDU Energy KVAH |
- |
PDU Total Energy |
Not found (Required) |
PDU Frequency |
- |
PDU Temperature |
1.3.6.1.4.1.318.1.1.26.10.2.2.1.8.1 |
PDU Humidity |
1.3.6.1.4.1.318.1.1.26.10.2.2.1.10.1 |
PDU Bank1 Sts |
1.3.6.1.4.1.318.1.1.26.8.3.1.4.1 |
PDU Bank2 Sts |
1.3.6.1.4.1.318.1.1.26.8.3.1.4.2 |
PDU Power supply 1Sts |
1.3.6.1.4.1.318.1.1.26.4.3.1.13.1 |
PDU Power supply 2Sts |
1.3.6.1.4.1.318.1.1.26.4.3.1.13.1 |
We need OID’s for the Energy KWAH & Total Energy parameter is this particular
regards,
Sathish Kumar S
Posted: 2023-03-06 06:59 AM
Hi @SathishKumarS,
The most recent PowerNet MIB is available here: https://www.se.com/us/en/download/document/APC_POWERNETMIB_446_EN/?searchSource=guided
Best,
Jackie