Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: 2025-01-3110:10 AM
New PCNS Set-up for two UPS
Hi,
We have two UPS for the below servers and planning implement PCNS, based on the UPS set-up configured, would like to know as per the best practice what should be the correct value and reason for that? please advise.
Note: both the UPS have runtime of 30 mins with 100% charge
Current UPS set-up:
Server Rack - Left PDU
Server Rack - Right PDU
Cisco HyperFlex (VMWare) - Top Left
Cisco HyperFlex (VMWare) - Top Left
Cisco HyperFlex (VMWare)- Bottom Left
Cisco HyperFlex (VMWare)- Bottom Right
Server A - Left
Server A - Right
Server B - Left
Server B- Right
Synology - Bottom
Synology - Top
Server C - Left
Server C - Right
Server D - Top
Server D - Bottom
Server E - Top
Server E - Bottom
Server F - Top
Server F- Bottom
Server G - Top
Server G - Bottom
Server H- Top Plug (Left)
Server H - Top Plug (Right)
Server H - Bottom Plug (Left)
Server H - Bottom Plug (Right)
Server I - Top Plug (Left)
Server I - Top Plug (Right)
Server I - Bottom Plug (Left)
Server I- Bottom Plug (Right)
PCNS Configuration:
Setting
Recommended Value to be set?
Reason
Low Battery Duration
Maximum Required Delay
On-Battery Shutdown Behaviour (Restart when power is restored or Turn off and stay off or Ignore PCNS Shutdown commands)
Virtualization Settings
Virtual Machine and Virtual Appliance, Shutdown and Startup
Shutdown Duration (Sec)
Startup Duration (Sec)
vCenter Server VM Shutdown duration (Sec)
Disabling vCLS Duration
Enabling vCLS Duration
UPS Shutdown (Do not turn off the UPS or Turn off the UPS orTurn off the UPS Outlet Group )
Configuring Events in UPS
Configuring Events in UPS
UPS on Battery Event (Delay time?)
VM Prioritization
VM Shutdown (High à ? Seconds, Medium à ? Seconds Low à ? Seconds)
VM Startup (High à ? Seconds, Medium à ? Seconds Low à ? Seconds)
We are taking three groups (High- vCenter,Medium- 18 VMs, Low 10 VMs )