Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Notifications
Login / Register
Community
Community
Notifications
close
  • Forums
  • Knowledge Center
  • Events & Webinars
  • Ideas
  • Blogs
Help
Help
  • Explore Community
  • Get Started
  • Ask the Community
  • How-To & Best Practices
  • Contact Support
Login / Register
Sustainability
Sustainability

Launch of Consumer/Home Owner registration process!
We are pleased to announce the commencement of the Consumer/Home Owner Registration Process on Community. Consumers/Home Owners may now proceed to register by clicking on Login/Register. The process is straightforward and designed to be completed in just a few steps.

Tesla EV charger load management CTs don't fit Square D SC3042M200PF meter panel bus bars

Metering & Power Quality

Schneider Electric support forum about Power Meters (ION, PowerTag, PowerLogic) and Power Quality from design, implementation to troubleshooting and more.

Search in

Improve your search experience:

  • Exact phrase → Use quotes " " (e.g., "error 404")
  • Wildcard → Use * for partial words (e.g., build*, *tion)
  • AND / OR → Combine keywords (e.g., login AND error, login OR sign‑in)
  • Keep it short → Use 2–3 relevant words , not full sentences
  • Filters → Narrow results by section (Knowledge Base, Users, Products)
cancel
Turn on suggestions
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Home
  • Schneider Electric Community
  • EcoStruxure Power & Grid
  • Metering & Power Quality
  • Tesla EV charger load management CTs don't fit Square D SC3042M200PF meter panel bus bars
Options
  • Mark Topic as New
  • Mark Topic as Read
  • Float this Topic for Current User
  • Bookmark
  • Subscribe
  • Mute
  • Printer Friendly Page
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send Invite Cancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Send New Invite Close
Top Experts
User Count
Charles_Murison
Picard Charles_Murison Picard
511
Mehran_Mehrnia
Captain Mehran_Mehrnia Captain
115
Ramasamy_N
Captain Ramasamy_N Captain
115
Robert_Lee
Admiral Robert_Lee Admiral
96
View All

Invite a Colleague

Found this content useful? Share it with a Colleague!

Invite a Colleague Invite
Solved Go to Solution
Back to Metering & Power Quality
Start a Topic
Solved
jcbottorff
jcbottorff
Cadet

Posted: ‎2024-03-05 10:57 PM

0 Likes
4
1671
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2024-03-05 10:57 PM

Tesla EV charger load management CTs don't fit Square D SC3042M200PF meter panel bus bars

I'm installing a Tesla Wall Connector EV charger using the Tesla dynamic load management controller (Neurio device).  The EV charger talks to the load controller over a RS-485 twisted pair using the modbus protocol. This allows setting the EV charger to deliver up to a full 48A, but reduce it if needed to assure the panel input current never exceeds 160A continuously (200A main breaker, panel has 225A bus). The existing maximum load calculation does not have an extra 48A required for permit approval. The split CT clamps (photo below) they supply don't quite close when put on the bus bars, there is a 1/8" gap. The CTs say they work up to a wire diameter of 0.75", but apparently the rectangular bus bars exceed this. I'm assuming split CT's don't work correctly unless the split gap is fully closed. The CTs for the Enphase solar system fit just fine, which must have about a 1" square hole. The original plan was to put the Tesla CTs above the already installed Enphase CTs, which I read works fine as long as I leave a 1" gap (as per info from a CT manufacturer).

 

This panel model is quite popular for people doing solar installs. Using a load controller like this seems like a better strategy than degrading the charging rate or what in many cases would be a very expensive service upgrade.

 

I haven't seen any evidence Tesla has alternative CTs with a bigger hole so am wondering if I could put the CTs before the meter around the incoming utility cables, which are round and am pretty sure would fit. This section of the meter panel has a utility company seal (left of meter in below photo), so assume I would have to get the power company to at least come inspect the CTs and put a new seal on the meter upstream compartment, if they even allow CTs to be placed before the meter. It's unclear if there are any holes from this section of the panel into an an adjoining customer accessible section, so might have to drill a small hole and put a rubber grommet for the CT wires to come through. This is PG&E in northern California.  

 

Attachments
Tags (1)
  • Tags:
  • english
Reply
  • All forum topics
  • Previous Topic
  • Next Topic

Accepted Solutions
Ramasamy_N
Captain Ramasamy_N Captain
Captain

Posted: ‎2024-12-20 04:15 AM

1 Like
0
1061
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2024-12-20 04:15 AM

Please connect with the respective technical support team. 

See Answer In Context

Reply
Replies 4
Ramasamy_N
Captain Ramasamy_N Captain
Captain

Posted: ‎2024-12-20 04:15 AM

1 Like
0
1062
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2024-12-20 04:15 AM

Please connect with the respective technical support team. 

Reply
EnlightenedElectrical
EnlightenedElectrical
Cadet

Posted: ‎2025-07-12 02:03 PM

0 Likes
2
350
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2025-07-12 02:03 PM

Hello can you please share the model number of the Tesla NEURIO dynamic Power meter? Is it Tesla 1112484-99-A or possibly Neurio meter 1938241-00-A. Tesla sent me the 1938241-00-A version and Tesla One app does not see it. Im trying to get it working with Tesla Gen 3 Wall Connector in USA. Thanks. 

Reply
Charles_Murison
Picard Charles_Murison Picard
Picard

Posted: ‎2025-07-14 08:55 AM

0 Likes
0
349
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2025-07-14 08:55 AM

Hello @EnlightenedElectrical ,

I would recommend reaching out to Tesla support for a Tesla product.

 

Regards,

Charles

L4 Prime for Advanced metering and Utilities
Reply
jcbottorff
jcbottorff
Cadet

Posted: ‎2025-07-15 01:21 AM

0 Likes
0
337
  • Mark as New
  • Bookmark
  • Subscribe
  • Mute
  • Permalink
  • Print
  • Email to a Friend
  • Report Inappropriate Content

Link copied. Please paste this link to share this article on your social media post.

‎2025-07-15 01:21 AM

That's exactly the part number I received. If it does not show up in the Tesla One app that suggests it's not working. You do need to feed it power on the voltage legs to run the internal electronics. It believe it will not show up unless the wall charger detects it it responds. The wall controller will be sending modbus reads every second or so. If it doesn't work try flipping the +/- RS-485 signals, there labeling as I remember is not so clear.

Reply
Preview Exit Preview

never-displayed

You must be signed in to add attachments

never-displayed

 

You’ve reached the end of your document

WHAT’S NEXT?

Ask our Experts

Didn't find what you are looking for? Ask our experts!

My Dashboard

Check out the new Feeds and activities that are relevant to you.

To The Top!

Forums

  • APC UPS Data Center Backup Solutions
  • EcoStruxure IT
  • EcoStruxure Geo SCADA Expert
  • Metering & Power Quality
  • Schneider Electric Wiser

Knowledge Center

Events & webinars

Ideas

Blogs

Get Started

  • Ask the Community
  • Community Guidelines
  • Community User Guide
  • How-To & Best Practice
  • Experts Leaderboard
  • Contact Support
Brand-Logo
Subscribing is a smart move!
You can subscribe to this board after you log in or create your free account.
Forum-Icon

Create your free account or log in to subscribe to the board - and gain access to more than 10,000+ support articles along with insights from experts and peers.

Register today for FREE

Register Now

Already have an account? Login

Terms & Conditions Privacy Notice Change your Cookie Settings © 2025 Schneider Electric

Welcome!

Welcome to your new personalized space.

of

Explore