Optimizing desalination plant operations in Australia for the future
Success Stories Corner
Have a sustainability or efficiency problem? Learn how Schneider Electric is using an ecosystem approach around EcoStruxure to solve customer problems.
Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for
Show only
|
Search instead for
Did you mean:
Invite a Co-worker
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
• High availability of plant and reduction of maintenance cost
• Reduction of energy cost given desalination’s high energy usage
• Overcome shortage of water by creating a reliable source of drinking water
The solution
The Segment Coupler connects the PROFIBUS DP network of the Modicon M340, M580 and X80 to PROFIBUS PA field devices using featured couplers like the Segment Protector and the FieldBarrier.
The Multi-Input/Output device is designated for connecting NAMUR contacts and low-power solenoid valves to the PROFIBUS PA network.
Customer benefits
• Managing Instrumentation with M580, M340 and X80 on PROFIBUS PA
• Minimizing CAPEX – Optimizing the plant and energy consumption and in return lowering the costs associated with the desalination process
Customer testimonial
“
Schneider Electric was assigned to design, build, operate and maintain the desalination plant for the next 20 years in one of the largest water treatment plants in Australia.” - Plant Project Manager, Australian Desalination Plant