Schneider Electric support forum for our Data Center and Business Power UPS, UPS Accessories, Software, Services, and associated commercial products designed to share knowledge, installation, and configuration.
Send a co-worker an invite to the Exchange portal.Just enter their email address and we?ll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Have a SRT5K that gives me a RBC 1 not connected alarm. I have 3 RBC's connected. The second RBC has a red light flashing. I did a deadhead/cold restart. I did move batteries from RBC 1 to RBC 2 to see if the red light issue followed. It did, so I put the batteries from RBC1 to RBC 3 so that I could eliminate the 3rd RBC from the system until batteries could be brought is. But when I did this the 2nd RBC light came back on.