New Community Ranking System
Our Community ranking system has recently been updated. You may notice changes in user rankings and receive system messages or notifications. If you have questions about how the new ranking works, please refer to the announcement post for more details (click here).
Battery replacement dates not visible on web interface
APC UPS Data Center & Enterprise Solutions Forum
Schneider, APC support forum to share knowledge about installation and configuration for Data Center and Business Power UPSs, Accessories, Software, Services.
Search in
Improve your search experience:
Exact phraseโUse quotes " "(e.g., "error 404")
WildcardโUse * for partial words(e.g., build*, *tion)
AND / ORโCombine keywords(e.g., login AND error, login OR signโin)
Keep it shortโUse 2โ3 relevant words, not full sentences
FiltersโNarrow results by section(Knowledge Base, Users, Products)
Send a co-worker an invite to the portal.Just enter their email address and we'll connect them to register. After joining, they will belong to the same company.
You have entered an invalid email address. Please re-enter the email address.
This co-worker has already been invited to the Exchange portal. Please invite another co-worker.
Please enter email address
Send InviteCancel
Invitation Sent
Your invitation was sent.Thanks for sharing Exchange with your co-worker.
Link copied. Please paste this link to share this article on your social media post.
Posted: โ2025-01-3008:17 AM
Using the LCD Menu / NMC / Smart Connect to determine the battery installation date assumes the information is correct and not faked.
The battery cartridge has a service life of 2-5 years which is based on usage, temperature, and environmental conditions.
All of the cartridges and individual cells will have a production sticker. This is the ONLY true indicator as to a date of manufacture.
Not when it was installed, not how much life is left available in the cartridge (RBC). Only a static & dynamic load test which should be performed at least once a year is a true indicator.
If this is a serious installation you will have carbon pile load testers, conductance meter, and a Fluke certified multi meter to validate the other important criteria that is referenced to the battery data sheet.